Adams and Frank Resurfacing

General Information

Project Location(s):
East Adams Street
East Frank Street
Project Status:
Design
Bid Opening Date:
TBD
Mandatory Pre Bid Meeting:
TBD
QuestCDN Number:
TBD
Construction Start Date:
2026
Construction Completion Date:TBD
Contractor:
TBD
Construction Engineer:
TBD
Design Engineer:
TBD
Awarded Contract Amount:
TBD
Adjusted Final Contract Amount:
TBD
Funding Source(s):

Objective

To improve the condition of the roadway by means of selected pavement rehabilitation methods.

Description

This project consists of milling and resurfacing, intermittent curb and gutter removal and replacement, driveway removal and replacement, ADA ramps with detectable warnings, pavement patching as needed, drainage and utility structure adjustments or reconstructions with new frame and lid/grate, and landscaping.

Justification

The Village’s Pavement Management Program has determined that the condition of the street has deteriorated to the point that pavement rehabilitation is needed.

Bidding & Planholders Information

All requests for information or clarification shall be submitted to the Village of Villa Park by email to engineering@invillapark.com.  All responses that are provided to requests for information or clarification will be provided through QuestCDN at https://www.questcdn.com.

The Village will accept requests for information or clarification submitted in accordance with the above requirements until the date and time specified in the Advertisement for Bids. Requests for information or clarification received after such time will not be accepted and will receive no response.

Bidding Documents

Contract Documents

Related Documents

Project Updates

Date
Description
January 1, 2026This project is in the planning stages.