Park Boulevard Improvement Project (Ardmore to Cornell)

General Information

Project Location(s) Map:
East Park Boulevard from Ardmore to Cornell
Project Status:
Design
Bid Opening Date:TBD
Mandatory Pre Bid Meeting:
TBD
QuestCDN Number:
TBD
Construction Start Date:
2026
Construction Completion Date:
TBD
Contractor:
TBD
Construction Engineer:TBD
Design Engineer:
Civiltech Engineering, Inc.
Awarded Contract Amount:
TBD
Adjusted Final Contract Amount:
TBD
Funding Source(s):
MFT Funding

Objective

To improve the condition of the existing street parking, roadway, and public sidewalk. To improve pedestrian safety and accessibility under ADA requirements.

Description

The scope of work for this project is yet to be finalized. The design engineer is creating multiple alternatives for this project.

This project consists of roadway and sidewalk improvements to Park Boulevard between Ardmore Avenue and Cornell Avenue. The south side of the roadway has sidewalk between the back of curb and the front edge of several buildings. The existing sidewalk doesn’t meet ADA guidelines. This project will replace the sidewalk with ADA compliant sidewalk. This work will require replacement of the curb and gutter and the adjacent parking lane and possibly part of the roadway. The entire roadway and parking lane will be resurfaced at a minimum. Limits of reconstruction versus resurfacing will be based on design of south side sidewalk grading to meet ADA guidelines.

Justification

The Village’s Pavement Management Program has determined that the condition of the street has deteriorated to the point that pavement rehabilitation is needed. Modernization of the sidewalk and street parking is needed to meet current ADA requirements and guidelines.

Bidding & Planholders Information

All requests for information or clarification shall be submitted to the Village of Villa Park by email to engineering@invillapark.com.  All responses that are provided to requests for information or clarification will be provided through QuestCDN at https://www.questcdn.com.

The Village will accept requests for information or clarification submitted in accordance with the above requirements until the date and time specified in the Advertisement for Bids. Requests for information or clarification received after such time will not be accepted and will receive no response.

Bidding Documents

Related Documents

Project Updates

Date
Description
October 3, 2025Design of the project continues.
May 2, 2025Design of the project is currently underway.
April 18, 2025A resolution for design engineering services was awarded at the April 14, 2025 Village Board Meeting.
January 1, 2025This project is in the planning stages.