Harvard and Jackson Resurfacing Project

General Information

Project Location(s):
Harvard Avenue from Jackson to Madison
Jackson Street from Addison to Ardmore
Project Status:
Design
Bid Opening Date:
TBD
Mandatory Pre Bid Meeting:
TBD
QuestCDN Number:
TBD
Construction Start Date:
TBD
Construction Completion Date:TBD
Contractor:
TBD
Construction Engineer:
TBD
Design Engineer:
V3 Companies, Ltd.
Awarded Contract Amount:
TBD
Adjusted Final Contract Amount:
TBD
Funding Source(s):
MFT Funding

Objective

To improve the condition of the roadway by means of selected pavement rehabilitation methods.

Description

This project consists of milling and resurfacing, intermittent curb and gutter removal and replacement, driveway removal and replacement, ADA ramps with detectable warnings, pavement patching as needed, drainage and utility structure adjustments or reconstructions with new frame and lid/grate, and landscaping.

Justification

The Village’s Pavement Management Program has determined that the condition of the street has deteriorated to the point that pavement rehabilitation is needed.

Bidding & Planholders Information

All requests for information or clarification shall be submitted to the Village of Villa Park by email to engineering@invillapark.com.  All responses that are provided to requests for information or clarification will be provided through QuestCDN at https://www.questcdn.com.

The Village will accept requests for information or clarification submitted in accordance with the above requirements until the date and time specified in the Advertisement for Bids. Requests for information or clarification received after such time will not be accepted and will receive no response.

Bidding Documents

Contract Documents

Related Documents

Project Updates

Date
Description
September 12, 2025A design engineering agreement was approved at the September 8, 2025 Village Board Meeting. Design of the project is underway.
May 2, 2025This project is in the planning stages.